SEPTA: RRD: Paoli/Thorndale (R5) trains are operating with delays of up to 15 minutes due to signal problems.
SEPTA: RRD: Paoli/Thorndale (R5) trains are operating with delays of up to 15 minutes due to signal problems.
The rest is here:
SEPTA: RRD: Paoli/Thorndale (R5) trains are operating with delays of up to 15 minutes due to signal problems.
Tags: lansdale, minutes-due, operating-with, paoli, passengers-board, pennbrook, pennbrook-stations-, rrd, septa, the-inbound, trains-are
This entry was posted
on Saturday, March 27th, 2010 at 2:40 pm and is filed under Septa, Septa Twitter Feed.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.