SEPTA: RRD: Media-Elywn (R3) trains are operating with delays of up to 15 minutes due to track work.

SEPTA: RRD: Media-Elywn (R3) trains are operating with delays of up to 15 minutes due to track work.

Read the original post: 
SEPTA: RRD: Media-Elywn (R3) trains are operating with delays of up to 15 minutes due to track work.

Leave a Reply

You must be logged in to post a comment.